Plan Of Activites 2022

Plan of Activities for the Year 2022

S.NOActivity Details AttachedDate Of CommencementDate of Accomplishment

Intended Goals Details Attached
1Railway Line link from Karachi to Gaddani.01-1-202230-12-22400,000/-A Reliable mode of transport and Logistics 
2
SETTING UP OF HUB SPECIAL ECONOMIC ZONE AT HUB.
01-03-202230-12-22300,000/-Industrial growth and prosperity of the people of the region 
3SETTING UP OF SEA FOOD CITY AT DHAM.01-03-2022100,000/-Opening of new opportunities in the field of fisheries and opening the opportunities for the export of sea food 
4SETTING UP OF DATE CITY AT HUB.01-04-2022350,000/-Opening the sales opportunities for local produce in local and international market. 
5BUILDING OF DUAL CARRIAGEWAY OF NORTHERN BYPASS BY NHABrought Forward from Last year31-12-2022150,000/-Ease of commutation for public and commercial transport
6Environmental issues and setting up sewerage Water Treatment Plant at HUB01-6-2022On- going250,000/-Compliance of Environmental laws in the industries. 
7SETTING UP OF SOLID WASTE MANAGEMENT FACILITY AT HUB;01-7-2022Same as above.
8
MEETING WITH MANAGER AND EXECUTIVE OFFICERS OF THE MEMBERS.
01-1-2022On-going350,000/-To discuss and resolve the issues of the industry and to provide guidance and support where required.
9RESOLVING THE WATER CRISES AT HUB AND GADDANI;01-04-202231-12-222000,000/-Assuring adequate sustainable supply of water to industries and people of the area.
10Pre-Budget Proposals and post Budget feedback of the Business & Industrial Sector01-04-202201-07-2022NILTo collect the view of the industrial and business community and forward to government for financial bill.
11Liaison with Law Enforcing Agencies.01-1-202201-120202210,000,000/-For all the year security of the area, creating a peaceful environment for business activity.
12New LABOUR LAWS. 01-1-202201-03-20223500,000/-To modify the labour laws making them  industry as well as employees friendly laws 
13COORDINATION OF INDUSTRIES WITH LIGHT ENGINEERING UPGRADATION CENTRE, (LEUC) HUB.01-1-2022On-going100,000/-To bridge between Academia and industry for education of students accordingly and to absorb them in the industry.
14Operating COVID-19 Vaccination Centre at LCCI Office.B/F from Last yearContinue:500,000/-Protecting people against the virus, reduce its spread.

*It may kindly be noted that many of the above activates may take more time for completion. 

Anjum R Khan

Secretary General 

PLAN OF ACTIVITIES OF  

LASBELA CHAMBER OF COMMERCE AND INDUSTRY 

FOR 2022

INTRODUCTION

Lasbela District serves as principal Gateway to the largest province of the country and it’s Port of Gawader. Proximity to the port city of Karachi, the hub of economic activities of the country, distinguish Lasbela in the whole province of Balochistan. 

Chamber has played significant role in improving the working environment for industries which are operational and for developing the infrastructure to invite industrial, agricultural and commercial investment in the District, by way of working with LIEDA under the conception of public / private partnership in the following long term and short-term activities:

There are 250+ industrial units in the district including sea food related products, Power plant, Cement, Textile yarns and Fabrics, Glucose, Sugar, Confectionery, Food Products, fish meal products, Pharmaceutical, Petrochemicals, Chemicals, Ceramics, Paper, Packaging material, Engineering goods, Steel , Marble & Granite etc. We see addition of 000’s of industries soon with the announcement of new Special Economic Zone at Hub.

RCD highway, Northern Bye Pass and Coastal High way, connect this region with rest of the country. The infrastructure upgrading under CPEC projects would make it further important for attracting the investments.

LASBELA CHAMBER’S VISION

Work for Ease of Business, Facilitate the industries for better working environment, helping create employment opportunities and improving the living standards of the people.  

OBJECTIVES

To perform roll for creating conducive environment to attract agricultural and industrial investment in Lasbela District.

To propose & pursue the ideas / proposals for working on the untapped natural resource of the province. Keep drawing the attention of the government to initiate projects for the industrial. Commercial and agricultural development of the province. 

To keep close liaison with Federal and Provincial Governments, Law enforcing authorities, LIEDA, District and City Governments for this purpose.

Creating awareness on national and international levels regarding Mineral resources of the province and the district. To pursue the industrialist for bringing modern techniques of mining and processing of minerals here for making value added product rather than exporting the mineral in the shape of raw material only.  

To draw the attention of the government and attract investments for Sea Food Processing Date Processing, Wind and Solar power projects, mining and exploration.

To facilitate the members in solving their problems regarding the interpretation of laws and procedures, provision of infrastructure facilities, performing the coordination role of bridge between Government and the private sector.

LONG TERM ACTIVITIES:

Railway Line link from Karachi to Gaddani

Brief Description and economic importance.Back ground: 
+3In August 2020 The Federal Government approved Rs. 10.5 Bn. (USD 66 Mn.) rehabilitation package for Karachi Circular Railway restoration. Good news for Lasbela district is that in the west, this railway line would reach up to Hub. We find it the right time to take benefit of this plan and put our proposal to connect Giddani as well with Karachi thorough Railway track. For this purpose we need to support this project and try to add Giddani (may be other destinations ahead also) to this track. Few benefits of this proposal would be as follows:
Connecting Hub and Giddani with the main railway track of the country would bring an economic revolution in this region. Presently, Hub & Giddani could only be approached through roads form Karachi and other parts of the country. If Hub & Giddini are connected through railway line, it would payback in a very short period. Few benefits would immediately starts giving fruits like:The scrap generated through Ship Breaking which is transported to different destinations in the country by roads, would have a cost effective reliable mode of transportation and would load their scrap directly from Giddani for any destination in Pakistan
It would provide easy and cost effective transport to the companies to bring their raw material and forward finished goods produces here to their customers in whole Pakistan and to the Karachi Port for export to other countries.
The work force, supplier and visitors coming to Hub industrial area, Marble city and Giddani, vender would use this cheaper, safe & reliable mode of transport daily basis. Railway link would remarkably reduce the traffic load specially the load of heavy Commercial traffic load on N-5, reducing traffic hazards, road accidents, traffic congestions and road deterioration due to heavy traffic and pollution. It would provide a safe, cost effective means of transport to the tourists and picnickers who come to Giddani every week. The number of picnickers and visitor could multiply thousand time having this connection.The arrival of visitors in such a high number would provide unlimited customers to the hotels. Shops. Gift shops, Local Handicraft and dresses, Marble Products, Fish and other sea food sellers, Balochistan’s dates and dry fruits. New shops and hotels would emerge very fast.  
Working involved.Preparation of the proposal and forwarding it to Federal and Provincial Governments for their consideration. Contacting Pakistan Railway. 
Chamber’s support Under the directions of President LCCI, Secretary General would prepare and forward the proposal to the Prime Minister, Minister for Railway, Chief Minister, Chief Secretary and other authorities to discuss and push the proposal. Chamber’s leadership would meet the authorities to bring the focus of the decision makers towards this important proposal.
Financial implicationsPKR 400,000/- on raveling, for meetings, preparation of proposal, postage etc. 
Expected ResultAs stated above this project would bring prosperity to the region and would contribute towards ease of business. 
Result

SETTING UP OF HUB SPECIAL ECONOMIC ZONE AT HUB.

Brief Description and economic importance.LCCI was proposing Special Economic Zone in HITE since 2012.Since year 2012, foreseeing the massive potential for local and foreign investment due to CPECThe Special Economic Zone would be a game changer it would bring direct and indirect employment and business opportunities to this district and to the province. Now it is all set to launch the SEZ commercially. LIEDA is the executing Authority for this project.LCCI is monitoring the progress and would put its effort to launch the project as soon as possible for the industrial boom for this area & the province. .
Working involved.Meetings with LIEDA, Ministry, other Federal and  Provincial authorities for quick startup with provision of all the required amenities so that the industries could start manufacturing operations in the SEZ in a minimum possible time.
Chamber’s support Chamber in close coordination with LIEDA would keep follow-up at various government levels for launching the project at the earlies. Chamber would pursue in the forums including Board of Investment and Trade Balochistan and Balochistan Special Economic Zones and Industrial Estates Development & Management Company where Chamber represents in the boards of these forums. 
Financial implicationsTransportation charges and other expenses on meetings, presentations, and awareness sessions about the project etc. may be estimated at Rs. 300,000/-.  
Expected ResultBenefits of essential supporting amenities to small, medium and large-scale enterprises to grow and flourish in global market place bringing all round socio-economic prosperity for the Province of Balochistan. We expect that with the completion of this project, large number of industries will be setup thus creating large number of employment opportunities for skilled and un-skilled workers.Revenue generation for National Exchequer would be multiplied.
Result

SETTING UP OF SEA FOOD CITY AT DHAM.

Brief Description and economic importance.Dham is small town in Tehsil Sonmiani of Lasbela District having a small population of Fisherman. There is one fish processing unit and a prawn research center.There is great potential in the coastal area around this town to have heavy quantity of quality fish.Provision of infrastructure facilities to establish a Sea Food City in this Town will create opportunities for investors to set up fish processing plants thus giving an incentive to local Fisherman to increase their capability to catch quality fish in required quantity. In this way, the economic activities will increase thereby benefiting the local people. 
Working involved.Project is viable, subject to the availability of proper infrastructure. The SMEDA in collaboration with LIEDA and LCCI has prepared concept paper and submitted to the Government of Balochistan.The Government of Balochistan has assigned the work of setting up of Sea Food City to LIEDA at Dham, Lasbela. Chamber would pursue and would follow-up for the project 
Human Resource The Chamber’s office bearers would extend their support and cooperation to pursue the matter.Secretary General with the help of PRO to coordinate with LIEDA and the Government of Balochistan.
Financial implicationsTransportation charges and other expenses on this project may be estimated at Rs. 100,000/-.  
Expected ResultSetting up the Fish Processing Units Setting up the Fish and shrimp Farms.The local Fisherman would get modern fishing boat and trawlers and may incline towards using modern fishing techniques.It will help stop the use of illegal nets for fishing.It will contribute to increase the membership of the Chamber.
Result

SETTING UP OF DATE CITY AT HUB.

Brief Description and economic importance.The annual production of dates in Pakistan is estimated at around 550,000 tons. It is fifth largest dates producing country in the world.Out of total production of dates in Pakistan, about 200,000 tons are produced in Balochistan.Only 86,000 tons is exported and the rest is either consumed or perished due to the absence of proper processing facilities.After proper processing, the exports may be enhanced up to $200 million. In this way, the economic activities will increase thereby benefiting the local people. 
Working involved.Prepared the concept paper for setting up of Date City at Hub and presented to the Government of Balochistan for further processing. Visits to Turbat, Khuzdar and other date producing areas to have meetings with the growers to find the viability of the project. Chamber would table this proposal at various forums including Board of Investment and Trade Balochistan to get the approval at government level to take up this beneficial project at a fast pace
Human Resource The Chamber’s office bearers, including the representative at BOI Balochistan would extend their support and cooperation to pursue the matter.Secretary General with the help of PRO to coordinate with the Government of Balochistan.
Financial implicationsTransportation charges and other expenses on this project may be estimated at Rs. 350,000/-.  
Expected ResultSetting up Date Processing Units.Will help to promote and develop well-organized date cultivation and date processing industry.Will help enhancement of entrepreneurship in the local growers.Will provide direct and indirect employment of thousands of skilled and unskilled workers.Will help to increase the export of date manifolds with competitive prices thus earning huge amount of foreign exchange. It will contribute to increase the membership of the Chamber.
Result

BUILDING OF DUAL CARRIAGEWAY OF NORTHERN BYPASS BY NHA;

Brief Description and economic importance.On request of the Chamber during 2004, the NHA completed the Northern Bye Pass to link Karachi and Hub and onwards to Gawader and Quetta through RCD High way. Due to its single carriage way however, many fatal accidents took place and with the increase of traffic, many such accidents are likely to occur.The Chamber therefore, suggested making this Highway duel carriageway to cater to the requirements of increasing traffic flow.  
Working involvedRepresentations to the Sindh Provincial management of NHA at Karachi and Head Quarters at Islamabad have been forwarded explaining the importance of the Project.Meetings have also been held with the Project Director of KNBP of NHA to suggest the project and to take short-term measures to avoid accidents.NHA have in principle agreed to the proposal and the have completed their homework. Government has approved the Project e and with the allocation of funds, the same may be executed.
Human ResourceThe Chamber’s office bearers and if needed the Chamber’s delegation will keep continuous liaison with NHA to start the project and complete the same in time.
Financial implicationsEstimated Transportation Charges and other expenses of the delegation during the stay in Islamabad Rs.100,000/-
Expected ResultThe work on project of building duel carriageway at Northern Bye Pass may be started soon after the allocation of funds by the Government. This would facilitate the safe moment of heavy and light traffic coming from Sindh and going from Balochistan.May ultimately cater to the increasing traffic between Karachi and Hub and onward to Sonmiani and Gawader Ports in the wake CEPC.May provide an incentive for the industrial and commercial investment in Lasbela District.
Result

Environmental issues and setting up sewerage Water Treatment Plant at HUB

Brief Description and economic importance.In order to get immunity from Environmental issues and to facilitate the exports of the products manufactured in Lasbela, it has been planned to set up a Sewerage Water Treatment plant.The initial survey has been made in the year 2006.In response to the request of the Chamber, the Ministry of Climate Changed, Government of Pakistan and EPA Balochistan would arrange the funds for this project from international donors, provided the compliance of environmental laws by the industries at Hub. 
Working involvedInitial survey revealed that the sewerage system of Hub Industrial area and Hub City has to be renovated.On the suggestion of Chamber, LIEDA has started the renovation work on sewerage system in Industrial area. The Chamber has also advised its members to get the compliance of the environmental laws with the coordination of EPA, Balochistan. For this purpose, the Chamber has facilitated the members with respect to provision of services of competent consultant and the fixation of their professional fee at reasonable level. However, this is a continuous process and the members are following with the help of the Chamber and the consultants arranged by the Chamber on reasonable terms.The Chamber’s role is to coordinate with consultants, LIEDA, Federal, Provincial and Local Government and to properly accomplish the work.To arrange meetings and presentations to get the close coordination amongst all stakeholders. 

Human Resource

The Office bearers, Chairman LCCI Environment sub-committee, Secretary General and the staff will be involved in the working. 
Financial implicationsEstimated cost of arranging meetings and preparing presentations of the Project, visits of Chamber’s delegation to EPA Balochistan, Quetta, members’ meetings to create awareness about the law etc.: Rs.500,000/-.
Expected ResultChamber’s efforts resulted in compliance of by more than 100 industries. Either these units have been given NOCs by EPA Balochistan or their approvals are in process.
Chamber is work is on-going keep the companies complained and to meet the National standards of Environment control at all times. 
It will also provide an incentive for further investment thus increasing the strength of the Chamber as well.
Result

SETTING UP OF SOLID WASTE MANAGEMENT FACILITY AT HUB;

Brief Description and economic importance.In order to get immunity from Environmental issues and to facilitate the exports of the products manufactured in Lasbela, it has been planned to set up a Solid Waste Management Facility at Hub with the help of Ministry of Climate Change, Government of Pakistan.There is no site or facility available at Hub Industrial area or Gaddani Ship Breaking Yard to dispose off the solid waste generated from ship breaking yard and industries. On the request of the Chamber, the Ministry of Climate Change would help to arrange the setting up of this facility at Hub that may cater to the needs of both industries and ship breaking yard at Gaddnai. UNDP Switzerland based Consultants with the help of the Ministry of Climate Change and the Chamber have prepared the survey report and the project proposal. The Project has been designed at a cost of US$ 30 million.With help of EPA Balochistan and the Balochistan Development Authority, LIEDA has allocated land for this purpose.With the help of the Federal and Provincial Governments, the facility may be set up with funding from the international donors including UNDP for which two donors conferences have made arranged by the Ministry of Climate Change, Government of Pakistan.
Working involvedThe Chamber’s Consultant M/s. Global Environmental Management Services (GEMS) have arranged the initial survey by the experts from the Consultants of UNDP on this issue.The data regarding the type and quantity of solid waste generated by the industries and ship-breaking yard have been collected and compiled enabling the Consultants for designing the facility. The Project has been designed and referred to the EPA Balochistan for further processing. Chamber’s role is to coordinate with consultants, LIEDA, Federal, Provincial and Local Government.. 
Financial implicationsEstimated cost of arranging meetings and preparing presentations of the Project, visits of Chamber’s delegation to the Ministry of Climate Change, Islamabad, EPA Balochistan, Quetta, members’ meetings etc. to create awareness about the issue will cost about: Rs.500,000/-.
Expected ResultOn persuasion of the Chamber, land has been allocated for this project. For funding. EPA and BDA are working with the donner agencies. The setting up of the facility may result in getting the international immunity from the environmental issues.It may also serve as the incentive for further investment in the region.
Result

RESOLVING THE WATER CRISES AT HUB AND GADDANI;

Brief Description and economic importance.Since last two years, the Hub City and Gaddani are suffering from the shortage of water from the Huh Dam. Recent rains have topped up the Hub dam but ware is not available to the industry and the people of the area as per requirement.Due to this scarcity of water both public and industries are compelled to purchase water from the water tankers by spending huge amount of rupees thus leaving extra burden on the poor people of Hub. This extra expense on water also badly affects the cost of production of the industries.In order to resolve this problem the LCCI suggested increasing the share of water from Hub Dam for this area because the distribution formula was agreed in 1981 when the population of this City was only few thousand. Now it has increased many folds and the consumption has increased with the same ratio.The Chamber also suggested top lay an exclusive pipeline from Hub Dam to the LIEDA reservoir in order to save water from theft, seepage and evaporation losses.It was also suggested to set up a water desalination plant at Gaddani.. 
Working involvedLCCI has filed a petition in the High Court of Balochistan for the increase in water share for Balochistan from Hub Dam. The Honorable High Court of Balochistan advised both the Governments of Sindh and Balochistan to resolve this issue amicably. LCCI is suggesting the laying of exclusive pipeline from Hub Dam to LIEDA reservoir and setting up of seawater desalination plant at Gaddani, as an alternate source.For this purpose, the Government of Balochistan has to be pursued to take the initiative for this project.. 

Human Resource

The Office Bearers, Secretary General and the staff will be involved in the working, by way of having representations and meetings with Chief Minister of and concerned ministers of Balochistan. 
Financial implicationsEstimated cost of arranging meetings and preparing presentations of the Project, visits of Chamber’s delegation to the Chief Minister, Chief Secretary and concerned Ministers and other relevant departments at Quetta to pursue the matter will cost about: Rs.500,000/-.
Expected ResultEnsuring the availability of increased volume of water Hub Dam to the public and industries of Hub and Gaddani.Ensuring the availability of alternative source of water for this area.It may also serve as the incentive for further investment in the region.
Result

SHORT TERM ACTIVITIES

MEETING WITH MANAGER AND EXECUTIVE OFFICERS OF THE MEMBERS.


Brief Description and economic importance.

Annually, Chamber organizes meeting of Managers, Executives with the representatives of the authorities. This facilitates for better understanding of rules, briefing of changes if any, and resolving the issues and problems of the industry
Government agencies like EOBI, BESSI, LIEDA, Labor, City Government, Police etc. in the month of February/March every year. 
Working involvedChamber would invite the member to attend the meetings. g.The President will invite the City Administrator, DPO, DCO and Government Officers of various agencies posted in Lasbela District to attend the meeting.Chamber would invite government officials from different departments who would update the members on any change in the rules and regulations.Managers and Officers would have the opportunity to put their quarries for the understanding of laws and rules from the concerned Government functionaries, present on the occasion.
Human ResourcePresident will invite the Members, DCO, DPO, Chairman, Union Council, Hub and Government Officers posted in Lasbela District.The Secretary General would contact the member to compile the problems, issues and quarries from the members and prepare a draft working paper to provide a basis for discussion.The PRO will supervise the question/answer session and make the required arrangement.The PRO will invite the Press.
Financial implicationsThe estimated cost of every meeting Rs.200,000/-, which may be met from the chamber’s income from members subscription and charges for other services.
Expected ResultDevelopment of good working relations between the members and the Government functionaries under the auspices of the Chamber.The members may update themselves with the latest legal amendments if any and its implications.
Result

Pre-Budget Proposals and post Budget feedback of the Business & Industrial Sector.

Brief Description and economic importance.Every year, before announcement of the Federal Budget, Chamber start gathering the Budget proposal from the members to forward them to Ministry of Finance to include in the Finance bill.On announcement of Federal Budget, the members are invited to inform the Chamber about any discrepancies in the levies of direct and indirect taxes.Chamber would organize post budget seminar with the collaboration of Inland Revenue Commissionerate at Hub and Customs Collectorate, in which the speakers explain the changes in Income Tax, Sales Tax and Customs Laws announced in the Budget and the implications on the business. Alternatively, if the situation doesn’t allow a meeting, the feedback of the members would be obtained through mails and would be forwarded to the Govt.The Chamber would organize this Seminar in the second half of every year.
Working involvedThe Commissionerate of Inland Revenue, Hub and Quetta and the Customs Collectorate at Hub and Quetta will be approached to collaborate with the Chamber by way of providing competent speakers on various issues.The date and program of seminar will be finalized in consultation with the above offices.The Commissioner, Inland Revenue, Quetta and Collector of Customs MCC, Quetta will be invited as Chief Guest.  The members would be invited to attend the seminar. 
Human ResourceThe Secretary General will approach the Commissioner, Inland Revenue at Hub and Quetta to chalk out the program.The PRO and other staff will invite the members for participation in the seminar and will make seminar arrangement.
Financial implicationsThe estimated cost of dissemination of information and arrangements in every seminar: Rs. 300,000/-, which may be met from the chamber’s income from members subscription and charges for other services.
Expected ResultMember awareness would enhance on taxation laws and the change in them.The members may forward and discuss the proposals for improvement of the system.
Result

New LABOUR LAWS. 

Brief Description and economic importance.Conquest to 18th Constitutional amendment, many department including labor department has been moved to provincial domain. Chamber has hosted and participated in a series of tripartite meetings to prepare draft labor laws for the province.  This work was done sine year 2015. The employers’ recommendations on various section in the draft labor laws were finalized and presented to the Government of Balochistan for their consideration through Tripartite Consultative Committee in which employers recommendations were included. 
The bill presented and passed by the Provincial Assembly was however found to be different form the agreed recommendations. Chamber would review and pursue for amendments/ Corrections to bring the law back to the recommendation of the Provincial Tripartite Consultative Committee. 
Working involvedContact to respective Ministry, Director General Labor Welfare, stakeholders to resolve the issue. Legal assistance would be sought for a right direction towards resolving the issue. 
Financial implicationsThe estimated cost of dissemination of information, visits & meetings would be about Rs. 500,000/-, which may be met from the chamber’s income from members subscription and charges for other services. 
Expected ResultThe concerned officers of the members would have the chance of participation in the work of finalization of labor laws and procedures in accordance with the current requirements in the context of 18th Constitutional Amendment.It is expected that because of these efforts, the Labor Laws would be so formulated which may ensure the safeguarding of the interests of both employers and the workers resulting in the smooth production activities as well promotion of industrial investment in the province of Balochistan. 
Result

Liaison with Law Enforcing Agencies.

Brief Description and economic importance.Peaceful business environment is necessary for the smooth running of business activity.  It is inevitable to have a very close coordination with Law enforcing agencies of the district and of the province. Chamber would continue its cooperation with Lasbela District Police Department, High Police Officials and other law enforcing agencies in the region.Meetings would be conducted with officials of Police, FC and district management for developing a close coordination network for the peaceful environment in the area.
Working involvedThe IG/PPO or DIG/RPO, DPO and their officers including the SHOs of concerned Police Stations would be invited
Human ResourceGuest would be invited by the President and by the Secretary General on the instructions and guidance of the President at a suitable date. Deputy Secretary/ PRO would make all arrangement and media coverage. 
Financial implicationsThe estimated cost of this meeting Rs. 300,000/-, which may be met from the chamber’s income from members subscription and charges for other services.
Expected ResultGood connections with Police and other agencies would help to maintain peaceful business friendly atmosphere. 
Result

COORDINATION OF INDUSTRIES WITH LIGHT ENGINEERING UPGRADATION CENTRE, (LEUC) HUB.

Brief Description and economic importance.Light Engineering Upgradation Centre was an initiative of LCCI. Work on this center was started in year 2009 by Technology Upgradation and Skill Development Company (TUSDEC), Ministry of Production, Government of Pakistan. It is operational since 2017.  .The services the LEUC provides includes the repairing of machines and equipment, measurement, hardness testing, plastic molding works and making of machinery parts and related works. And, Training to the capable local youths and on the job training to the industry workers.Initially government supporting the Centre financially. Eventually Centre have to be self-sufficient with respect to revenue generation and meeting of its expenses. The Project is valuable for the industries who can save their money and time rendered to repair their equipment repaired as well as to conduct various tests. They may avail the facility of enhancing the capacity of their workers through on the job training at the centre. Local technical Human resource are being developed.
Working involvedPresident and Chairmen of LCCI, Labor, infrastructure, industries and human resources sub-committees of the Chamber would continue to create awareness of the facilities at LEUC, so as industries could be benefited at the maximum. The Secretary General attends the board meetings of the Centre. Three members of Chamber are also on the Institute Management Committee. 
Human ResourceThe Office Bearers and Chairman of LCCI, Labor, infrastructure, industries and human resources sub-committees of the Chamber will provide the guidelines to run the affair of the Centre.The Secretary General and staff will arrange the meetings of industries with LEUC management.The PRO will arrange the logistics for the meetings and presentations.
Financial implicationsThe estimated cost of each meeting with the Diplomats is estimated to be at Rs. 350,000/-, which may be met from the chamber’s income from members subscription and charges for other services.
Expected ResultEnsuring the satisfactory technical services to the industries at reasonable cost and with the agreed time limit. Ensuring the availability of trained workers in accordance with the requirement of industries. Ensuring to create confidence amongst the local youths with respect to the capability and economic empowerment thus creating healthy social environment.
Result

COVID-19 Vaccination Centre 

Brief Description and economic importance.COVID-19 vaccination center established last year would remain continue till it is required. 
Working involvedProvision of Air-conditioned hall, Computer & logistics 
Human ResourceSecretary General monitor the whole activity and ensure registration of the vaccinated. LCCI schedule the activity and make time table for factories to send the staff on their turn, so that the center may not be over crowded. Another resource provided to record the data of vaccinated person to post on NADRA portal.    
Financial implicationsRs.70000/- per month. (Electricity, Wages for resource, transportation)
Expected ResultProtection against virus, reducing spread of virus. 
ResultThis center has vaccinated 15,000 staff, workers and general people to protect from the Virus. LCCI was successful to provide this service to member companies and general public to be vaccinated in a comfortable environment consuming minimum time. 

(Anjum R. Khan)

Secretary General